WATER MATTER ALLIANCE - CLEVELAND BAY WPP UPGRADE


MPA was asked to construct and supply the majority of Motor Control Centres used in the Cleveland Bay Upgrade, and to design and supply three major PLC cabinets to control the existing and new site hardware as well as integrate all other PLC/SCADA systems on site into a single control system.

The upgraded plant uses Membrane Filters and replaces the old surface aeration basin technology allowing for a higher grade of effluent. The plant was also increased in size to handle higher flow quantities.

The new system benefits the client as it uses currently supported PLC hardware and software. The Membrane Reactors are state of the art wastewater treatment technology and produce a high quality of effluent in a smaller physical area. The PLC/SCADA automates many plant functions thus reducing the workload on plant operators.


PLC
Siemens S7-315-2PN/DP, Citect SCADA v6.1, DELL PCs, Siemens Scalence X408-2 GIgatbit Fiber/Copper Ethernet ring switches, Siemens Step 7 Programming Software.

PROJECT COST
$1.23 million